
Cooperation Background: The entrance and exit platform of a subway transfer station in a first-tier city had a daily passenger flow exceeding 150,000. The original concrete floor developed cracks and accumulated water with slipping risks on rainy da...
Read More
Cooperation Background: A new breeding platform was built at a deep-sea aquaculture base, requiring walkways and guardrails for aquaculture personnel to work. The platform needed to withstand seawater immersion, salt spray corrosion and typhoon impa...
Read More
Cooperation Background: The steel gratings on the walkways of an offshore oil drilling platform had long been exposed to seawater, crude oil corrosion and wave impact, resulting in zinc layer peeling and structural loosening. There was a risk of per...
Read More
Cooperation Background: A new pipe rack project in a chemical industrial park required the construction of an overhead platform spanning 15 workshops. It needed to adapt to complex pipeline layouts, while bearing the heavy load of maintenance equipm...
Read MoreOur professional sales team are waiting for your consultation.